The Power Division says load shedding in the country has been reduced to zero from 5 a.m. Monday as per announcement by Prime Minister Muhammad Shahbaz Sharif..
In a tweet on Sunday, the Division said more than 2,500 megawatts of additional electricity has been added to the system.
It said that the Ministry of Energy is constantly striving for uninterrupted power supply during and after the Eid holidays.